Everything you need to know about solar subsidies, net metering, and installation policies in UP — PM Surya Ghar Yojana, UPNEDA schemes, and DISCOM processes.

Get Free Solar Quote

Last verified: February 2026. We review this page quarterly for accuracy. Policy details sourced from MNRE, UPNEDA, and UPERC official publications.

PM Surya Ghar Muft Bijli Yojana

The PM Surya Ghar Muft Bijli Yojana is a central government scheme providing direct subsidy for residential rooftop solar installations. It aims to provide 300 units of free electricity per month to 1 crore households.

Subsidy Slabs

System CapacitySubsidy RateMax. Subsidy
Up to 2 kW₹30,000/kW₹60,000
2–3 kW₹18,000/kW (above 2 kW)₹78,000
3–10 kW₹9,000/kW (above 3 kW)₹1,08,000
Above 10 kWNo additional subsidy₹1,08,000 (capped)

Eligibility

  • Indian citizen with a residential electricity connection
  • Roof ownership or NOC from building owner
  • Aadhaar-linked bank account for direct benefit transfer
  • No existing rooftop solar system under any government scheme

Application Process

  1. Register on the PM Surya Ghar portal
  2. Apply with electricity bill and Aadhaar details
  3. Get feasibility approval from your DISCOM
  4. Choose a registered vendor (like BL Solar Solutions)
  5. Install the solar system and submit commissioning report
  6. Net meter inspection by DISCOM
  7. Subsidy credited directly to bank account within 30 days

UPNEDA State Subsidy & Support

The Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) implements state-level solar policies and provides additional support beyond central government schemes. UPNEDA empanels vendors, conducts quality checks, and facilitates approvals.

Vendor Empanelment

UPNEDA maintains a list of approved solar installers to ensure quality standards

Quality Certification

All installations are inspected and certified by UPNEDA-approved engineers

Technical Assistance

Free technical consultation for system sizing and component selection

Grievance Redressal

Dedicated complaint handling for solar installation issues

Net Metering Policy in UP

Net metering is regulated by UPERC (UP Electricity Regulatory Commission). It allows residential and commercial consumers to feed excess solar power back to the grid and receive credit on their electricity bills.

Maximum CapacityUp to sanctioned load or 500 kWp (whichever is lower)
Billing CycleMonthly adjustment, annual settlement
Surplus CreditsCarried forward for up to 12 months, then purchased at APPC rate
MeteringBi-directional meter provided by DISCOM (at consumer cost)
TariffExport credits at applicable consumption tariff rate

DISCOM-wise Application Process

Each DISCOM in Uttar Pradesh has a slightly different application process for solar net metering. Below are the steps for the major DISCOMs in our service area.

LESA (Lucknow)

Lucknow Electricity Supply Administration

  1. 1Apply online via UPPCL portal or visit LESA office
  2. 2Submit technical feasibility report
  3. 3Get net metering approval (15–30 days)
  4. 4Install solar system with approved vendor
  5. 5LESA inspection and meter installation
  6. 6Bi-directional meter commissioning

KESCO (Kanpur)

Kanpur Electricity Supply Company

  1. 1Submit application at KESCO division office or online
  2. 2Feasibility check by KESCO engineer
  3. 3Approval letter issuance (10–20 days)
  4. 4Installation by UPNEDA-registered vendor
  5. 5KESCO inspection and testing
  6. 6Net meter activation and billing adjustment

Other DISCOMs

DVVNL, MVVNL, PuVVNL, PVVNL

  1. 1Apply via respective DISCOM office or UPPCL portal
  2. 2Technical feasibility assessment
  3. 3Net metering approval (15–45 days varies by DISCOM)
  4. 4Installation with UPNEDA-registered vendor
  5. 5DISCOM inspection and bi-directional meter setup
  6. 6Grid connection and billing commencement

Required Documents Checklist

Keep these documents ready before applying for solar installation under PM Surya Ghar or any UPNEDA scheme.

Aadhaar Card (linked with mobile number)
Latest electricity bill (not older than 3 months)
Bank passbook / cancelled cheque
Roof ownership proof (registry / NOC from landlord)
Passport-size photograph
PAN card (for systems above 5 kW)
DISCOM consumer number
Signed net metering application form

Subsidy Disbursement Timeline

7–15 days

Application to Feasibility Approval

DISCOM reviews technical feasibility

15–30 days

Vendor Selection & Installation

Choose UPNEDA vendor, complete installation

7–15 days

DISCOM Inspection

Site inspection and meter installation

3–7 days

Commissioning Report Submission

Submit to PM Surya Ghar portal

15–30 days

Subsidy Credit to Bank

Direct Benefit Transfer after verification

Total estimated timeline: 45–90 days from application to subsidy disbursement.BL Solar Solutions handles all coordination to minimise delays.

Tax Benefits for Solar

Residential — Income Tax Benefits

Interest paid on loans taken for solar installation may be claimed under Section 80C deductions. No GST on the subsidy component. Solar systems attract 12% GST on panels and 18% on inverters and other components.

Commercial — Accelerated Depreciation

Businesses can claim 40% accelerated depreciation on solar assets in the first year under the Income Tax Act. This significantly reduces the effective cost of solar for commercial and industrial consumers. Combined with energy savings, typical ROI is 3–5 years for commercial installations.

Recent Policy Updates

January 2026

PM Surya Ghar portal streamlined

Application tracking improved with SMS updates at each stage. Average processing time reduced.

November 2025

UPERC net metering order updated

Surplus energy settlement period extended to 12 months. Banking of credits now allowed across billing cycles.

August 2025

UPNEDA vendor empanelment renewed

New empanelment cycle completed. Stricter quality requirements for panel efficiency and inverter standards.

FAQs

UP Solar Policy FAQ

Common questions about solar subsidies, net metering, and policies in Uttar Pradesh

Under PM Surya Ghar Muft Bijli Yojana, residential consumers in UP can get up to ₹30,000/kW subsidy for systems up to 2 kW, ₹18,000/kW for 2–3 kW, and ₹9,000/kW for 3–10 kW. The maximum subsidy is capped at ₹1,08,000.

Net metering in UP allows you to export excess solar electricity to the grid. Your bi-directional meter records both import and export units. At billing time, exported units are adjusted against imported units. If you export more than you import, the surplus is carried forward for up to one year.

UP has multiple DISCOMs: LESA (Lucknow), KESCO (Kanpur), DVVNL (Agra zone), MVVNL (Meerut zone), PuVVNL (Varanasi zone), and PVVNL (Lucknow rural). Each has its own application process but follows UPERC net metering regulations.

Net metering approval typically takes 15–45 days depending on the DISCOM. LESA and KESCO are usually faster (15–30 days). After approval, meter installation takes an additional 7–15 days.

Residential consumers can claim benefits under Section 80C for solar loan interest. Commercial and industrial consumers can claim accelerated depreciation of 40% in the first year under the Income Tax Act, significantly reducing the effective cost of solar installation.

You need: Aadhaar card (linked with mobile), latest electricity bill, bank passbook, roof ownership proof, passport photo, PAN card (for >5 kW), DISCOM consumer number, and a signed net metering application form.

UPNEDA provides additional support through the state solar policy including technical assistance, quality certification, and vendor empanelment. Some district-level incentives may also apply. Check with your local DISCOM for the latest state-level benefits.

Still have questions?

Our solar experts are here to help you make an informed decision

Ready to Go Solar in Uttar Pradesh?

BL Solar Solutions handles your entire PM Surya Ghar application, DISCOM approvals, and installation. Get a free quote today.

Useful next steps for homeowners and businesses comparing rooftop solar in Uttar Pradesh.