Uttar Pradesh Solar Policy Guide

Last updated: 15 March 2026
Everything you need to know about solar subsidies, net metering, and installation policies in UP — PM Surya Ghar Yojana, UPNEDA schemes, and DISCOM processes.
Get Free Solar QuotePM Surya Ghar Muft Bijli Yojana
The PM Surya Ghar Muft Bijli Yojana is a central government scheme providing direct subsidy for residential rooftop solar installations. It aims to provide 300 units of free electricity per month to 1 crore households.
Subsidy Slabs
| System Capacity | Subsidy Rate | Max. Subsidy |
|---|---|---|
| Up to 2 kW | ₹30,000/kW | ₹60,000 |
| 2–3 kW | ₹18,000/kW (above 2 kW) | ₹78,000 |
| 3–10 kW | ₹9,000/kW (above 3 kW) | ₹1,08,000 |
| Above 10 kW | No additional subsidy | ₹1,08,000 (capped) |
Eligibility
- Indian citizen with a residential electricity connection
- Roof ownership or NOC from building owner
- Aadhaar-linked bank account for direct benefit transfer
- No existing rooftop solar system under any government scheme
Application Process
- Register on the PM Surya Ghar portal
- Apply with electricity bill and Aadhaar details
- Get feasibility approval from your DISCOM
- Choose a registered vendor (like BL Solar Solutions)
- Install the solar system and submit commissioning report
- Net meter inspection by DISCOM
- Subsidy credited directly to bank account within 30 days
UPNEDA State Subsidy & Support
The Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) implements state-level solar policies and provides additional support beyond central government schemes. UPNEDA empanels vendors, conducts quality checks, and facilitates approvals.
Vendor Empanelment
UPNEDA maintains a list of approved solar installers to ensure quality standards
Quality Certification
All installations are inspected and certified by UPNEDA-approved engineers
Technical Assistance
Free technical consultation for system sizing and component selection
Grievance Redressal
Dedicated complaint handling for solar installation issues
Net Metering Policy in UP
Net metering is regulated by UPERC (UP Electricity Regulatory Commission). It allows residential and commercial consumers to feed excess solar power back to the grid and receive credit on their electricity bills.
DISCOM-wise Application Process
Each DISCOM in Uttar Pradesh has a slightly different application process for solar net metering. Below are the steps for the major DISCOMs in our service area.
LESA (Lucknow)
Lucknow Electricity Supply Administration
- 1Apply online via UPPCL portal or visit LESA office
- 2Submit technical feasibility report
- 3Get net metering approval (15–30 days)
- 4Install solar system with approved vendor
- 5LESA inspection and meter installation
- 6Bi-directional meter commissioning
KESCO (Kanpur)
Kanpur Electricity Supply Company
- 1Submit application at KESCO division office or online
- 2Feasibility check by KESCO engineer
- 3Approval letter issuance (10–20 days)
- 4Installation by UPNEDA-registered vendor
- 5KESCO inspection and testing
- 6Net meter activation and billing adjustment
Other DISCOMs
DVVNL, MVVNL, PuVVNL, PVVNL
- 1Apply via respective DISCOM office or UPPCL portal
- 2Technical feasibility assessment
- 3Net metering approval (15–45 days varies by DISCOM)
- 4Installation with UPNEDA-registered vendor
- 5DISCOM inspection and bi-directional meter setup
- 6Grid connection and billing commencement
Required Documents Checklist
Keep these documents ready before applying for solar installation under PM Surya Ghar or any UPNEDA scheme.
Subsidy Disbursement Timeline
Application to Feasibility Approval
DISCOM reviews technical feasibility
Vendor Selection & Installation
Choose UPNEDA vendor, complete installation
DISCOM Inspection
Site inspection and meter installation
Commissioning Report Submission
Submit to PM Surya Ghar portal
Subsidy Credit to Bank
Direct Benefit Transfer after verification
Total estimated timeline: 45–90 days from application to subsidy disbursement.BL Solar Solutions handles all coordination to minimise delays.
Tax Benefits for Solar
Residential — Income Tax Benefits
Interest paid on loans taken for solar installation may be claimed under Section 80C deductions. No GST on the subsidy component. Solar systems attract 12% GST on panels and 18% on inverters and other components.
Commercial — Accelerated Depreciation
Businesses can claim 40% accelerated depreciation on solar assets in the first year under the Income Tax Act. This significantly reduces the effective cost of solar for commercial and industrial consumers. Combined with energy savings, typical ROI is 3–5 years for commercial installations.
Recent Policy Updates
PM Surya Ghar portal streamlined
Application tracking improved with SMS updates at each stage. Average processing time reduced.
UPERC net metering order updated
Surplus energy settlement period extended to 12 months. Banking of credits now allowed across billing cycles.
UPNEDA vendor empanelment renewed
New empanelment cycle completed. Stricter quality requirements for panel efficiency and inverter standards.
UP Solar Policy FAQ
Common questions about solar subsidies, net metering, and policies in Uttar Pradesh
Under PM Surya Ghar Muft Bijli Yojana, residential consumers in UP can get up to ₹30,000/kW subsidy for systems up to 2 kW, ₹18,000/kW for 2–3 kW, and ₹9,000/kW for 3–10 kW. The maximum subsidy is capped at ₹1,08,000.
Net metering in UP allows you to export excess solar electricity to the grid. Your bi-directional meter records both import and export units. At billing time, exported units are adjusted against imported units. If you export more than you import, the surplus is carried forward for up to one year.
UP has multiple DISCOMs: LESA (Lucknow), KESCO (Kanpur), DVVNL (Agra zone), MVVNL (Meerut zone), PuVVNL (Varanasi zone), and PVVNL (Lucknow rural). Each has its own application process but follows UPERC net metering regulations.
Net metering approval typically takes 15–45 days depending on the DISCOM. LESA and KESCO are usually faster (15–30 days). After approval, meter installation takes an additional 7–15 days.
Residential consumers can claim benefits under Section 80C for solar loan interest. Commercial and industrial consumers can claim accelerated depreciation of 40% in the first year under the Income Tax Act, significantly reducing the effective cost of solar installation.
You need: Aadhaar card (linked with mobile), latest electricity bill, bank passbook, roof ownership proof, passport photo, PAN card (for >5 kW), DISCOM consumer number, and a signed net metering application form.
UPNEDA provides additional support through the state solar policy including technical assistance, quality certification, and vendor empanelment. Some district-level incentives may also apply. Check with your local DISCOM for the latest state-level benefits.
Still have questions?
Our solar experts are here to help you make an informed decision
Ready to Go Solar in Uttar Pradesh?
BL Solar Solutions handles your entire PM Surya Ghar application, DISCOM approvals, and installation. Get a free quote today.