PM Surya Ghar Checklist 2026
Every step, every document, every component needed to apply, install, and receive your ₹78,000 subsidy under PM Surya Ghar Muft Bijli Yojana. Print this page — it's a single-sheet companion for your entire solar journey.
PM Surya Ghar Checklist 2026
Every step to apply, install, and receive your ₹78,000 subsidy.
Pre-Application
4 stepsVerify eligibility
Residential rooftop only. Must own the property or have written NOC from owner. Must have a live DISCOM electricity connection in your name.
- • Property tax receipt or sale deed
- • Electricity bill (last 3 months)
Calculate required system size
⏱ 15 min using our Solar CalculatorMatch system size to your monthly consumption. Typical: 2-3 kW for a small home, 3-5 kW for a medium home, 5+ kW for a large home with AC.
Check roof area availability
⏱ 10 min (measure roof)You need ~70 sq ft of shadow-free south-facing roof per kW. For a 3 kW system: ~210 sq ft.
Shortlist MNRE-registered vendors
Only MNRE-approved vendors can register your system for subsidy. BL Solar Solutions is MNRE & UPNEDA registered.
- • Vendor empanelment certificate
Application
5 stepsRegister on PM Surya Ghar portal
⏱ 10 minVisit pmsuryaghar.gov.in. Click "Apply For Rooftop Solar". Select your state and DISCOM.
- • Mobile number
- • Electricity consumer number
Submit application with bill details
⏱ 15 minUpload your latest electricity bill. Enter consumer number, bill amount, and desired system size.
Wait for DISCOM feasibility approval
⏱ 3-7 daysDISCOM verifies your connection details and technical feasibility. Usually takes 3-7 business days.
Select your registered vendor
⏱ 1-2 weeks for quotesChoose from MNRE-empanelled vendors. Get quotes from 2-3, compare using our Solar Calculator.
Sign installation contract
Contract must include system specs, warranties, timeline, and final price after subsidy.
- • Vendor quote
- • Signed contract
- • Advance payment receipt
Installation
5 stepsSite survey and design
⏱ 2-4 hours on siteVendor visits, measures roof, confirms panel layout, mounting structure design, and cable routes.
Install mounting structure
⏱ 1-2 daysHDGI or aluminium mount anchored to roof at correct tilt angle (~latitude × 0.87 + 3.1).
Install panels and wiring
⏱ 1-2 daysPanels clamped to mount, MC4 connectors secured, DC cables routed to junction box and inverter.
Install inverter and AC distribution
⏱ 1 dayInverter mounted indoors/shed, AC output connected to home distribution panel and bi-directional meter.
Earthing and surge protection
⏱ 1 dayEarth pits dug, SPDs installed, all metal parts bonded. Resistance must be ≤ 5Ω.
Post-Install & Subsidy
6 stepsDISCOM inspection and net meter installation
⏱ 1-2 weeks after completionDISCOM engineer inspects installation, certifies compliance, and installs bi-directional net meter.
Commissioning and performance test
Solar array turned on, inverter synced to grid, real-time generation confirmed.
- • Commissioning certificate from installer and DISCOM
Submit subsidy claim on portal
Upload installation certificate, commissioning report, bank details, and photos to PM Surya Ghar portal.
- • Commissioning report
- • Invoice
- • Bank account statement
- • Photos of installation
Receive central subsidy (30-45 days)
⏱ 30-45 business daysMNRE credits subsidy (₹30k-78k) directly to your bank account after verification.
Receive UP state subsidy (if eligible)
⏱ 60-90 daysUttar Pradesh adds ₹15,000/kW (max ₹30,000) via UPNEDA. Disbursed 60-90 days after central subsidy.
Set up monitoring and AMC
Activate RMS portal, register for monitoring alerts, book annual maintenance contract (₹1,500-5,000/year).
Required kit items & components
Every PM Surya Ghar installation must include these components. Verify each item is delivered before final payment, and keep photos of serial numbers, DCR stickers, and certificates.
Solar Panels (DCR Mandatory)
Must be DCR-certified (Domestic Content Requirement). Only DCR panels qualify for PM Surya Ghar subsidy — non-DCR panels are rejected even if they're cheaper.
DCR-certified Mono PERC panels (540W standard)
Required~6 panels per kW (540W each)Convert sunlight to DC electricity. Must be made in India from Indian silicon.
- BIS certified (IEC 61215 / IEC 61730)
- DCR tag from MNRE-approved manufacturer
- 25-year linear performance warranty
- Module efficiency ≥ 20%
Panel mounting structure
RequiredHolds panels at correct tilt and azimuth. Anchored to roof.
- Hot-dip galvanized iron (HDGI) or aluminium
- Wind load rating ≥ 180 km/h
Junction box / combiner box
RequiredCombines panel strings safely with DC isolator and fuses.
- IP65 rated
- DC isolator ≥ 1000V
Solar Inverter (Grid-Tied)
Must be a grid-tied inverter with anti-islanding protection and net-metering compatibility. Pure-sine output is mandatory.
Grid-tied solar inverter
Required1 inverter per system (kVA ≈ kW size)Converts DC panel output to AC 230V/415V grid-compatible power.
- BIS certified (IEC 62109 / IEEE 1547)
- IEC 61683 efficiency certification
- Anti-islanding protection (prevents back-feeding during outages)
- Built-in MPPT (1-4 MPPT trackers)
- 5-year manufacturer warranty minimum
AC isolator / breaker
RequiredIsolates solar AC output from home panel for service and safety.
- ISI mark
- Rating ≥ inverter current
Net Metering & Monitoring
Bi-directional meter and data logger are mandatory for PM Surya Ghar. DISCOM installs the net meter after subsidy approval.
Bi-directional net meter (DISCOM approved)
RequiredInstalled by DISCOM after commissioningRecords both energy imported from grid and exported to grid.
- DISCOM approved model (UPPCL/MVVNL in UP)
- Class 1 accuracy
- Remote reading support
Data logger / monitoring (RMS)
RequiredTracks system performance, sends alerts for downtime.
- Compatible with MNRE remote monitoring portal
- WiFi / GSM connectivity
- Real-time production logs
Cabling & Protection
All cables must be UV-resistant, double-insulated, and sized correctly. Earthing and surge protection are non-negotiable.
DC solar cable (UV-stabilized, 4-10 mm²)
RequiredConnects panels to inverter. Must survive 25 years of roof exposure.
- TUV certified
- Rated 1000-1500V DC
- UV-resistant double insulation
AC cable (2.5-16 mm² based on system size)
RequiredConnects inverter to home panel and net meter.
- ISI mark
- Copper conductor
Earthing kit (rod + strip + chemical)
RequiredSafety earthing for panels, inverter, and structure.
- Resistance ≤ 5Ω
- Copper bonded / GI
- Separate earth pit per MCL
DC & AC surge protection devices (SPDs)
RequiredProtects electronics from lightning and grid surges.
- Type II SPD
- Rated for 1000V DC / 275V AC
MC4 connectors and end clamps
RequiredWeatherproof connections between panels and string cables.
- IP68 rated
- UV stable
Mandatory Documentation
Without these documents your DISCOM won't install the net meter and you won't receive your subsidy payout.
DISCOM connection & net-metering approval
RequiredSanction from UPPCL/MVVNL/DVVNL for grid synchronization.
MNRE vendor registration (installer)
RequiredOnly MNRE-registered vendors can register systems for subsidy.
System installation certificate
RequiredSigned by installer confirming correct installation and commissioning.
Panel flash test report
RequiredVerifies each panel meets rated wattage before installation.
Net metering commissioning report
RequiredDISCOM document confirming net meter is installed and working.
Subsidy claim documents
RequiredAadhaar, PAN, electricity bill, consumer number, bank statement.
Warranty & Service
You must receive written warranties for each component — check they're included in the installation contract.
Solar panel warranty
Required25-year linear performance + 10-12 year product warranty.
Inverter warranty
Required5 years standard, extendable to 10 years on premium models.
Mounting structure warranty
Required5-10 years against rust and structural failure.
Installation workmanship warranty
Required2-5 years from installer covering wiring, leaks, and connection failures.
AMC (Annual Maintenance Contract)
OptionalOptional but recommended — covers panel cleaning, inverter servicing, monitoring.
Red flags — refuse final payment if you see these
- Panel DCR certificates missing or manufacturer not on MNRE list.
- No flash test report showing measured wattage matches rated wattage.
- Earthing not measured (must be ≤5Ω, documented).
- SPDs (surge protection) not installed on DC and AC sides.
- No RMS / monitoring set up.
- Missing warranties in writing (panels 25yr, inverter 5yr, mounting 5-10yr, workmanship 2-5yr).
- Installer asks for full payment before DISCOM commissioning.
Before you begin, run the exact subsidy amount in our Subsidy Calculator so every line on this checklist maps to a number you expect to receive.
Frequently Asked Questions
What must be included in a PM Surya Ghar solar kit?
A complete PM Surya Ghar kit must include: DCR-certified solar panels, grid-tied inverter, mounting structure, DC & AC cables (UV-resistant), MC4 connectors, earthing kit, surge protection devices (SPDs), junction/combiner box, bi-directional net meter, and a data logger. See the full kit breakdown on this page.
Are DCR panels mandatory for PM Surya Ghar?
Yes. Only DCR-certified (Domestic Content Requirement) panels qualify for the subsidy. Non-DCR panels — even if cheaper — will cause your subsidy claim to be rejected. Read our detailed DCR guide.
How long does the full PM Surya Ghar process take?
30-45 days typical: 7-10 days planning + 3-7 days DISCOM feasibility + 2-4 days physical installation + 7-14 days DISCOM inspection + 30-45 days subsidy payout (central) + 60-90 days for UP state subsidy.
Can I claim the subsidy myself or must the installer do it?
You can claim it yourself on the PM Surya Ghar portal after commissioning. Most MNRE-registered installers handle the claim on your behalf as part of the installation service — make sure this is included in writing.
What documents should I keep after installation?
Installation certificate, panel flash test report, DCR certificates, DISCOM net meter commissioning report, inverter warranty, panel warranty, mounting structure warranty, and all invoices. Keep these in a folder for 25 years — you'll need them for warranty claims.
What if the installer skips something on the checklist?
Refuse final payment until every item is completed and documented. Common omissions: earthing resistance measurement, SPD installation, RMS (monitoring) setup. These are mandatory under MNRE guidelines — don't accept them as optional.
Can I use the checklist for commercial solar installations?
Yes — 90% of the items apply to commercial installs. Commercial systems are not eligible for PM Surya Ghar subsidy but follow similar installation, DISCOM approval, and commissioning steps. Net metering rules differ by state.
Is the checklist downloadable / printable?
Yes. Use your browser's print function (Ctrl/Cmd + P) to save or print this page. The layout is optimized for A4 paper with the checkboxes, phase labels, and document requirements clearly visible.