Solar Panel Installation in Badaun
UPNEDA registered PM Surya Ghar vendor serving Badaun district. Get up to Rs 1,08,000 subsidy on rooftop solar installation.
500+
Installations in UP
5.1 hours/day
Avg Peak Sunlight
Up to ₹1,08,000
Total Subsidy Available
4.6★
Google Rating
How much does solar installation cost in Badaun?
A 3kW solar system in Badaun costs approximately Rs 72,000 after PM Surya Ghar subsidy (Rs 78,000 central + Rs 30,000 UP state subsidy). MVVNL (Madhyanchal Vidyut Vitran Nigam Ltd) customers save Rs ₹1,500 - ₹4,000/month on average. EMI available from Rs 320/month. UPNEDA registered installer with 500+ installations across UP.
Source: BL Solar Solutions | Last updated: September 2026
Solar EMI vs Savings in Badaun
Compare your monthly EMI with electricity savings. Many systems pay for themselves through savings alone.
| System Size | After Subsidy | Monthly EMI | Monthly Savings | Net Cashflow |
|---|---|---|---|---|
| 1 kW | ₹15,000 | ₹320 | ₹840 | +₹520 |
| 2 kW | ₹30,000 | ₹625 | ₹1,680 | +₹1,055 |
| 3 kW | ₹72,000 | ₹1,500 | ₹2,520 | +₹1,020 |
| 5 kW | ₹1,92,000 | ₹4,000 | ₹4,500 | +₹500 |
* Best-case scenario. EMI at 9% p.a. over 60 months. Savings based on ₹7/unit tariff. Actual values vary by electricity usage and loan terms. Contact us for a personalized quote.
How Much Does Solar Cost in Badaun?
PM Surya Ghar Yojana and UPNEDA state subsidy reduce your solar installation cost significantly. Here is the complete breakdown for Badaun residents.
| System Size | Central Subsidy | State Subsidy | Total Subsidy | Approx. Cost | You Pay |
|---|---|---|---|---|---|
| 1 kW | ₹30,000 | ₹15,000 | ₹45,000 | ₹60,000 | ₹15,000 |
| 2 kW | ₹60,000 | ₹30,000 | ₹90,000 | ₹1,20,000 | ₹30,000 |
| 3 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | ₹1,80,000 | ₹72,000 |
| 4 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | ₹2,40,000 | ₹1,32,000 |
| 5 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | ₹3,00,000 | ₹1,92,000 |
| 10 kW | ₹78,000 | ₹30,000 | ₹1,08,000 | ₹6,00,000 | ₹4,92,000 |
* Prices are approximate and may vary based on brand, roof type, and system configuration. Contact us for an exact quote.
Why Choose BL Solar Solutions in Badaun?
UPNEDA Registered
Government-verified vendor for all subsidy schemes including PM Surya Ghar and state UPNEDA programs.
500+ Installations
500+ completed installations across Uttar Pradesh with 5MW+ total capacity.
10+ Experience
Decade-long track record in solar panel installation, maintenance, and subsidy processing.
Best Price Guarantee
Competitive pricing with up to Rs 1,08,000 subsidy assistance. Free site survey in Badaun.
Quick Installation
Residential installations completed in 1-2 days. Full process from survey to net meter in 2-4 weeks.
25-Year Warranty
Top brand panels with 25-year performance warranty. 5-year inverter warranty. Annual maintenance plans available.
What Our Customers Say
Rated 4.6/5 based on 72 Google reviews
What Solar Services Do We Offer in Badaun?
Complete solar solutions for homes, businesses, and government institutions in Badaun and Badaun district.
1kW to 10kW rooftop solar for homes in Badaun. PM Surya Ghar subsidy up to Rs 78,000. Net metering for zero electricity bills.
View Residential Plans10kW to 500kW solar for businesses in Badaun. Cut electricity costs by 60-80%. Accelerated depreciation tax benefits available.
View Commercial SolutionsEnd-to-end PM Surya Ghar Yojana application support for Badaun residents. Portal registration, documentation, and subsidy claim handling.
PM Surya Ghar GuideHow Does Solar Installation Work in Badaun?
From free site survey to subsidy in your bank account - we handle everything.
Free Site Survey
Our engineer visits your rooftop to assess solar potential, shading, and structural strength.
System Design & Quote
We design an optimal system based on your electricity consumption and roof area. You receive a detailed quotation.
PM Surya Ghar Registration
We handle your application on the PM Surya Ghar portal (pmsuryaghar.gov.in) and UPNEDA registration.
Installation
Our certified team installs panels, inverter, and wiring. Typical installation takes 1-2 days for residential systems.
Net Meter & Inspection
We coordinate with UPPCL for net meter installation and UPNEDA inspection for subsidy disbursement.
Subsidy Disbursement
After inspection approval, the central and state subsidy is credited directly to your bank account.
Areas We Serve in Badaun
We provide free site surveys and solar installation across all areas of Badaun and Badaun district.
Also serving nearby: Bareilly, Shahjahanpur, Etah, Kasganj, Farrukhabad
Growing Solar Demand in Badaun District
Badaun district has experienced increasing solar adoption as awareness of PM Surya Ghar subsidies grows. The district's towns — Dataganj, Sahaswan, and Bisauli — have seen particular interest from households looking to reduce electricity bills that often exceed Rs 3,000-4,000 monthly during summer.
Badaun's predominantly flat terrain and hot summers (temperatures exceeding 45°C) make rooftop solar especially productive. A 3kW system generates 12-15 units daily during peak summer months — more than enough to run fans, coolers, and lighting for an average Badaun household.
MVVNL Net Metering for Badaun Residents
Badaun district is served by MVVNL (Madhyanchal Vidyut Vitran Nigam Ltd). The Badaun electricity division supports net metering for all residential connections with a sanctioned load of 1kW or above.
BL Solar Solutions has established working relationships with the MVVNL Badaun office, enabling faster processing of net metering applications. We handle the entire process from application submission to meter commissioning, with typical completion in 2-4 weeks after panel installation.
Official Resources
- PM Surya Ghar Portal — Apply for solar subsidy (up to ₹78,000 central + ₹30,000 UP state)
- MNRE — Ministry of New and Renewable Energy guidelines
- UPNEDA — UP New and Renewable Energy Development Agency
How much solar actually generates in Badaun
Figures below use long-term peak sun hour data from the Shahjahanpur reference station, 19 km from Badaun, and the MVVNL (Madhyanchal Vidyut Vitran Nigam Ltd) tariff of ₹6.2/unit.
5.1
kWh/m² per day, annual average
1,489
after 20% system losses
4,467
units per year in Badaun
₹27,695
3kW at ₹6.2/unit
- System cost
- ₹1,80,000
- Subsidy
- −₹1,08,000
- You pay
- ₹72,000
- Recovered in
- 2.7 years
Over 25 years that system saves roughly ₹11,80,054 on Badaun electricity bills.
Assumes a 3kW system, 5% annual tariff rise, ₹2,000 yearly maintenance, and 0.5% panel degradation a year. Change any of those and the number moves — which is why they are printed here rather than hidden.
Generation peaks in May at 6.3 peak sun hours a day and bottoms out in Dec at 4.1. Sizing a system on the annual average rather than the summer peak is what keeps a winter bill from surprising you.
| Month | Peak sun hours/day | Units per kW |
|---|---|---|
| Jan | 4.2 | 102 |
| Feb | 5 | 122 |
| Mar | 5.8 | 141 |
| Apr | 6.2 | 151 |
| May | 6.3 | 153 |
| Jun | 5.5 | 134 |
| Jul | 4.6 | 112 |
| Aug | 4.5 | 109 |
| Sep | 4.9 | 119 |
| Oct | 5.4 | 131 |
| Nov | 4.7 | 114 |
| Dec | 4.1 | 100 |
Frequently Asked Questions About Solar in Badaun
A 3kW residential solar system in Badaun costs approximately Rs 1,80,000 before subsidies. After PM Surya Ghar central subsidy (Rs 78,000) and UPNEDA state subsidy (Rs 30,000), your net cost is around Rs 72,000. BL Solar Solutions provides free site surveys across Badaun district.
Yes, BL Solar Solutions serves all areas of Badaun district including Badaun city, Dataganj, Sahaswan, Bisauli, Bilsi, and surrounding tehsils. We are an UPNEDA registered vendor providing complete solar installation services.
To apply for PM Surya Ghar in Badaun: 1) Contact BL Solar Solutions for a free site survey, 2) We register your application on pmsuryaghar.gov.in, 3) After installation and MVVNL net meter setup, 4) UPNEDA inspects the system, 5) Subsidy is credited to your bank account within 30 days.
Absolutely. Badaun receives excellent sunlight (5.5 peak hours daily). A 3kW system generates about 400 units/month, saving Rs 1,500-4,000 monthly on electricity bills. With PM Surya Ghar subsidy reducing upfront cost to Rs 72,000, the system pays for itself in 2-3 years.
Solar panels require minimal maintenance — mainly cleaning every 2-4 weeks to remove dust, which is common in Badaun's dry climate. BL Solar Solutions provides a free maintenance guide and offers annual maintenance packages. The inverter may need inspection once a year. Panels themselves have no moving parts and last 25+ years.
Still have questions?
Our solar experts are here to help you make an informed decision
Nearby Service Areas
We also serve these districts near Badaun with the same quality solar installations.
Ready to Go Solar in Badaun?
Get a free site survey and detailed quotation. We handle the entire process including PM Surya Ghar registration, installation, and subsidy claim.
Mon - Sat: 09:00 - 18:00 | Free site surveys across Badaun