Sell excess solar power to the grid and reduce your electricity bill. Complete DISCOM-wise guide covering LESA, KESCO, DVVNL, MVVNL, PuVVNL, and PVVNL.

How does net metering work in UP?

Net metering in Uttar Pradesh allows solar panel owners to export excess electricity to the grid and receive credits on their bill. All 6 UP DISCOMs (LESA, KESCO, DVVNL, MVVNL, PuVVNL, PVVNL) support net metering for systems up to 500 kW. Surplus units are settled monthly with annual true-up at APPC rate (Rs 3-4/unit). Application takes 6-10 weeks from submission to meter installation.

Source: UPERC Rooftop Solar PV Regulations | Last updated: September 2026

What is Net Metering?

Net metering is a billing arrangement regulated by UPERC (UP Electricity Regulatory Commission) that allows on-grid solar system owners to export excess electricity to the power grid and receive credits on their electricity bill. A bi-directional meter records both the power you consume from the grid (import) and the power your solar panels send back (export). Homeowners can also avail subsidies via the PM Surya Ghar portal.

Monthly Adjustment

Export units are subtracted from import units each month. You only pay for the net difference.

Carry Forward

If you export more than you import in a month, surplus credits carry forward to the next month.

Annual Settlement

At financial year-end, remaining surplus units are settled at APPC rate (Rs 3-4/unit).

DISCOM-wise Net Metering Rules

UP has 6 electricity distribution companies. All follow UPERC regulations but have different application processes and timelines.

DISCOMDistrictsMax CapacityTimelineBilling

LESA

Lucknow Electricity Supply Administration

Lucknow500 kW (residential), 1 MW (commercial)15-30 days for feasibility, 7-15 days for meter installationMonthly net metering with annual true-up

KESCO

Kanpur Electricity Supply Company

Kanpur Nagar, Kanpur Dehat500 kW (residential), 1 MW (commercial)15-30 days for feasibility, 7-15 days for meter installationMonthly net metering with annual true-up

DVVNL

Dakshinanchal Vidyut Vitran Nigam Limited

Agra, Mathura, Firozabad, Mainpuri, Etah, Aligarh, Hathras500 kW per connection15-30 days for feasibility, 10-20 days for meter installationMonthly net metering with annual true-up

MVVNL

Madhyanchal Vidyut Vitran Nigam Limited

Bareilly, Shahjahanpur, Pilibhit, Budaun, Hardoi, Sitapur, Lakhimpur Kheri, Unnao, Barabanki500 kW per connection15-30 days for feasibility, 10-20 days for meter installationMonthly net metering with annual true-up

PuVVNL

Purvanchal Vidyut Vitran Nigam Limited

Varanasi, Prayagraj, Gorakhpur, Jaunpur, Mirzapur, Sultanpur, Azamgarh, Ballia, Ghazipur500 kW per connection15-30 days for feasibility, 10-20 days for meter installationMonthly net metering with annual true-up

PVVNL

Pashchimanchal Vidyut Vitran Nigam Limited

Meerut, Noida, Ghaziabad, Saharanpur, Muzaffarnagar, Hapur, Bulandshahr, Moradabad500 kW per connection15-30 days for feasibility, 10-20 days for meter installationMonthly net metering with annual true-up

* Timelines are indicative. Actual processing times may vary. As per UPERC Rooftop Solar PV Grid Interactive Systems Regulations.

How to Apply for Net Metering in UP

1

Apply for feasibility

Submit net metering application to your local DISCOM (LESA, KESCO, MVVNL, etc.) with electricity bill copy and property documents.

2

Receive feasibility approval

DISCOM reviews your application and issues feasibility approval within 15-30 days. They verify transformer capacity and grid compatibility.

3

Install solar system

Hire an UPNEDA-registered vendor to install the rooftop solar system. Vendor handles all technical requirements and safety standards.

4

Apply for net meter

After installation, submit commissioning report to DISCOM for bi-directional net meter installation.

5

DISCOM inspection

DISCOM inspects the installation for safety and compliance. They verify system specifications match the approved capacity.

6

Net meter installation

DISCOM installs the bi-directional net meter within 7-15 days of successful inspection. You start earning credits for exported power.

How Net Metering Billing Works

Billing Example: 3kW System in Lucknow
MonthImport (units)Export (units)Net UnitsBill (approx.)
April (Summer)45038070~Rs 490
July (Monsoon)400280120~Rs 840
October (Winter)300350-50Rs 0 (50 units carried)
January (Peak Winter)250300-50Rs 0 (50 units carried)

* Fixed charges and demand charges apply separately. Values are illustrative based on average 3kW system generation and typical residential consumption in Lucknow.

Documents Required for Net Metering

Application Stage
  • Recent electricity bill (within 3 months)
  • Aadhaar card of connection holder
  • Property ownership proof / registry
  • Rooftop photograph with clear sky view
Post-Installation
  • Solar system commissioning certificate
  • Single line diagram of installation
  • Inverter and module test certificates
  • UPNEDA inspection report

UP DISCOM Electricity Tariffs (Domestic)

Know your current electricity rate to calculate net metering savings. Below are slab-wise domestic (LMV-1) tariff rates for all 6 UP DISCOMs.

LESA

Lucknow Electricity Supply Administration

Slab (units)Rate (Rs/unit)Fixed (Rs)
0-100Rs 3.5Rs 80
101-150Rs 4.0Rs 100
151-300Rs 5.5Rs 125
301-500Rs 6.5Rs 150
501-500+Rs 7.0Rs 175

Districts: Lucknow

KESCO

Kanpur Electricity Supply Company

Slab (units)Rate (Rs/unit)Fixed (Rs)
0-100Rs 3.5Rs 80
101-150Rs 4.0Rs 100
151-300Rs 5.5Rs 125
301-500Rs 6.5Rs 150
501-500+Rs 7.0Rs 175

Districts: Kanpur Nagar, Kanpur Dehat

DVVNL

Dakshinanchal Vidyut Vitran Nigam Ltd

Slab (units)Rate (Rs/unit)Fixed (Rs)
0-100Rs 3.5Rs 70
101-150Rs 4.0Rs 90
151-300Rs 5.0Rs 110
301-500Rs 6.0Rs 140
501-500+Rs 6.5Rs 165

Districts: Agra, Mathura, Aligarh +7 more

MVVNL

Madhyanchal Vidyut Vitran Nigam Ltd

Slab (units)Rate (Rs/unit)Fixed (Rs)
0-100Rs 3.5Rs 70
101-150Rs 4.0Rs 90
151-300Rs 5.0Rs 110
301-500Rs 6.0Rs 140
501-500+Rs 6.5Rs 165

Districts: Bareilly, Shahjahanpur, Sitapur +4 more

PuVVNL

Purvanchal Vidyut Vitran Nigam Ltd

Slab (units)Rate (Rs/unit)Fixed (Rs)
0-100Rs 3.5Rs 70
101-150Rs 4.0Rs 90
151-300Rs 5.0Rs 110
301-500Rs 6.0Rs 140
501-500+Rs 6.5Rs 165

Districts: Varanasi, Gorakhpur, Allahabad (Prayagraj) +4 more

PVVNL

Paschimanchal Vidyut Vitran Nigam Ltd

Slab (units)Rate (Rs/unit)Fixed (Rs)
0-100Rs 3.5Rs 80
101-150Rs 4.0Rs 100
151-300Rs 5.5Rs 125
301-500Rs 6.5Rs 150
501-500+Rs 7.0Rs 175

Districts: Meerut, Ghaziabad, Noida +4 more

Source: UPERC Tariff Orders for FY 2025-26. Effective from 2025-04-01. Last verified: 2026-02-15. Rates are approximate and subject to revision by UPERC. Actual bills may include additional surcharges, taxes, and adjustments.

FAQs

Net Metering FAQs

Common questions about net metering in Uttar Pradesh

Net metering allows you to export excess solar power to the electricity grid and receive credits on your bill. A bi-directional meter records both import (from grid) and export (to grid) units. Your monthly bill is calculated as Import - Export units. In UP, surplus units are carried forward monthly and settled annually at APPC rate.

All six UP DISCOMs support net metering: LESA (Lucknow), KESCO (Kanpur), DVVNL (Agra region), MVVNL (Bareilly/central UP), PuVVNL (Varanasi/eastern UP), and PVVNL (Meerut/western UP). Net metering is available for residential systems up to 500 kW as per UPERC regulations.

The typical timeline is: Feasibility approval (15-30 days) + Installation (7-15 days) + DISCOM inspection (7-15 days) + Meter installation (7-15 days). Total: approximately 6-10 weeks from application to net meter activation.

Surplus units not consumed within the financial year are settled at the APPC (Average Pooled Power Purchase Cost) rate, typically Rs 3-4/unit. This means you get the most value by self-consuming solar power during daytime rather than exporting.

You need: Recent electricity bill, Aadhaar card, property ownership proof, rooftop photographs, solar system commissioning certificate from vendor, and bank details for subsidy (if applicable). Your UPNEDA-registered vendor handles most paperwork.

Yes, net metering is available for all consumer categories in UP — residential (up to 500 kW), commercial, and industrial. For systems above 500 kW, gross metering may apply. Commercial consumers benefit more due to higher electricity tariffs.

Yes, fixed charges and demand charges are billed separately regardless of net metering. Net metering only adjusts the energy (variable) charges based on import-export difference. However, your overall bill still drops significantly.

Yes, as an UPNEDA-registered vendor, BL Solar Solutions handles the complete net metering process — from DISCOM application to feasibility approval to meter installation. We work with all 6 UP DISCOMs across 12 districts.

Still have questions?

Our solar experts are here to help you make an informed decision

We Handle Your Net Metering Application

From DISCOM application to meter installation — BL Solar Solutions manages the complete process as an UPNEDA registered vendor.

Useful next steps for homeowners and businesses comparing rooftop solar in Uttar Pradesh.