Ends in: —d —h —m

Check Eligibility
Skip to main content
UPNEDA Registered Vendor | PM Surya Ghar Certified

Solar Panel Installation in Moradabad

UPNEDA registered PM Surya Ghar vendor serving all areas of Moradabad. Get up to Rs 1,08,000 subsidy on rooftop solar installation.

UPNEDA Registered500+ Installations4.5 Google Rating25-Year Warranty
WhatsApp Us

500+

Installations in UP

5.06 hours/day

Avg Peak Sunlight

Up to ₹1,08,000

Total Subsidy Available

₹1,500 - ₹4,000

Monthly Savings

How much does solar installation cost in Moradabad?

A 3kW solar system in Moradabad costs approximately Rs 72,000 after PM Surya Ghar subsidy (Rs 78,000 central + Rs 30,000 UP state subsidy). PVVNL (Pashchimanchal Vidyut Vitran Nigam Ltd) customers save Rs ₹1,500 - ₹4,000/month on average. EMI available from Rs 320/month. UPNEDA registered installer with 500+ installations across UP.

Source: BL Solar Solutions | Last updated: September 2026

Why Choose BL Solar Solutions in Moradabad?

UPNEDA Registered

Government-verified vendor for all subsidy schemes including PM Surya Ghar and state UPNEDA programs.

500+ Installations

500+ completed installations across Uttar Pradesh with 5MW+ total capacity.

10+ Experience

Decade-long track record in solar panel installation, maintenance, and subsidy processing.

Best Price Guarantee

Competitive pricing with up to Rs 1,08,000 subsidy assistance. Free site survey in Moradabad.

Quick Installation

Residential installations completed in 1-2 days. Full process from survey to net meter in 2-4 weeks.

25-Year Warranty

Top brand panels with 25-year performance warranty. 5-year inverter warranty. Annual maintenance plans available.

What Our Customers Say

Excellent service by BL Solar Solutions. They handled everything from registration to installation. Very professional team.

R

Rajesh Kumar

2 months ago

Got 3kW system installed. PM Surya Ghar subsidy was processed smoothly. Saving ₹2,500 every month on electricity.

P

Priya Singh

3 months ago

Good quality panels and inverter. Installation was done in one day. Net meter took a few weeks but they followed up with UPPCL.

A

Amit Verma

1 month ago

Very happy with our solar installation. BL Solar team explained everything clearly. Subsidy came within 2 months.

S

Sunita Devi

4 months ago

What Solar Services Do We Offer in Moradabad?

Complete solar solutions for homes, businesses, and government institutions in Moradabad and Moradabad district.

Residential Solar

1kW to 10kW rooftop solar for homes in Moradabad. PM Surya Ghar subsidy up to Rs 78,000. Net metering for zero electricity bills.

View Residential Plans
Commercial Solar

10kW to 500kW solar for businesses in Moradabad. Cut electricity costs by 60-80%. Accelerated depreciation tax benefits available.

View Commercial Solutions
PM Surya Ghar Assistance

End-to-end PM Surya Ghar Yojana application support for Moradabad residents. Portal registration, documentation, and subsidy claim handling.

PM Surya Ghar Guide

How Does Solar Installation Work in Moradabad?

From free site survey to subsidy in your bank account - we handle everything.

1

Free Site Survey

Our engineer visits your rooftop to assess solar potential, shading, and structural strength.

2

System Design & Quote

We design an optimal system based on your electricity consumption and roof area. You receive a detailed quotation.

3

PM Surya Ghar Registration

We handle your application on the PM Surya Ghar portal (pmsuryaghar.gov.in) and UPNEDA registration.

4

Installation

Our certified team installs panels, inverter, and wiring. Typical installation takes 1-2 days for residential systems.

5

Net Meter & Inspection

We coordinate with UPPCL for net meter installation and UPNEDA inspection for subsidy disbursement.

6

Subsidy Disbursement

After inspection approval, the central and state subsidy is credited directly to your bank account.

Official Resources

  • PM Surya Ghar PortalApply for solar subsidy (up to ₹78,000 central + ₹30,000 UP state)
  • MNREMinistry of New and Renewable Energy guidelines
  • UPNEDAUP New and Renewable Energy Development Agency

How much solar actually generates in Moradabad

Figures below use long-term peak sun hour data from the Bareilly reference station, 53 km from Moradabad, and the PVVNL (Pashchimanchal Vidyut Vitran Nigam Ltd) tariff of ₹7/unit.

Peak sun hours

5.06

kWh/m² per day, annual average

Units per kW per year

1,478

after 20% system losses

A 3kW system generates

4,434

units per year in Moradabad

Annual bill offset

31,038

3kW at ₹7/unit

What a 3kW system costs and returns in Moradabad
System cost
1,80,000
Subsidy
−₹1,08,000
You pay
72,000
Recovered in
2.4 years

Over 25 years that system saves roughly 13,28,511 on Moradabad electricity bills.

Assumes a 3kW system, 5% annual tariff rise, 2,000 yearly maintenance, and 0.5% panel degradation a year. Change any of those and the number moves — which is why they are printed here rather than hidden.

Month by month in Moradabad

Generation peaks in May at 6.3 peak sun hours a day and bottoms out in Dec at 4. Sizing a system on the annual average rather than the summer peak is what keeps a winter bill from surprising you.

Monthly peak sun hours and units generated per kW in Moradabad
MonthPeak sun hours/dayUnits per kW
Jan4.1100
Feb4.9119
Mar5.7139
Apr6.2151
May6.3153
Jun5.5134
Jul4.6112
Aug4.6112
Sep4.9119
Oct5.3129
Nov4.6112
Dec497

Frequently Asked Questions About Solar in Moradabad

A 3kW residential solar system in Moradabad costs approximately Rs 1,80,000 before subsidies. After PM Surya Ghar central subsidy (Rs 78,000) and UPNEDA state subsidy (Rs 30,000), your net cost is around Rs 72,000. BL Solar Solutions provides free site surveys across Moradabad district.

Yes, BL Solar Solutions serves all areas of Moradabad district including Moradabad City, Thakurdwara, Bilari, Chandausi, Civil Lines, and surrounding areas. We are an UPNEDA registered vendor providing complete solar installation services.

To apply for PM Surya Ghar in Moradabad: 1) Contact BL Solar Solutions for a free site survey, 2) We register your application on pmsuryaghar.gov.in, 3) After installation and PVVNL net meter setup, 4) UPNEDA inspects the system, 5) Subsidy is credited to your bank account within 30 days.

A typical residential solar installation in Moradabad takes 1-2 days for panel mounting and wiring. The complete process from site survey to net meter commissioning takes 2-4 weeks. Subsidy disbursement takes an additional 30-60 days after UPNEDA inspection.

Still have questions?

Our solar experts are here to help you make an informed decision

Nearby Service Areas

We also serve these districts near Moradabad with the same quality solar installations.

Ready to Go Solar in Moradabad?

Get a free site survey and detailed quotation. We handle the entire process including PM Surya Ghar registration, installation, and subsidy claim.

Mon - Sat: 09:00 - 18:00 | Free site surveys across Moradabad

Useful next steps for homeowners and businesses comparing rooftop solar in Uttar Pradesh.