Ends in: —d —h —m

Check Eligibility
Skip to main content
Back to Projects
Government Project

Government Hospital Solar Project

Critical infrastructure 100 kW solar installation at Shahjahanpur District Hospital with battery backup for emergency services and medical equipment. The hybrid system ensures 99.9% uptime for ICU and operation theatres, generates 1.4 lakh units annually, and reduces the hospital's electricity expenditure by 55% while offsetting 120 tons of CO2 each year.

Capacity
100 kW
Completed
October 2023
Location
Shahjahanpur District Hospital
Duration
60 days
Government Hospital Solar Project - solar installation project by BL Solar Solutions
55%
Bill Reduction
6 years
Return on Investment
70%
Energy Independence
!

The Challenge

Hospital required uninterrupted power for critical medical equipment and emergency services. High energy consumption from ICU, operation theaters, and diagnostic equipment.

Our Solution

Designed a robust 100kW hybrid system with battery backup specifically for critical loads. Seamless integration with existing DG sets. Zero downtime installation during off-hours.

Project Highlights

Key achievements and notable features from this installation.

Hospital-grade reliability (99.9%)

Uninterrupted power for ICU

Government tender approved

10-year comprehensive AMC

Remote monitoring 24/7

Backup for critical equipment

Technical Specifications

System components and configuration details for this project.

Panel Type
Monocrystalline 545W
Panel Count
184 Panels
Inverter
Medical Grade Hybrid Inverter
Inverter Capacity
100 kW
Battery Backup
8 hours for critical loads
Annual Generation
1,40,000 kWh/year
CO₂ Offset
120 tons/year

Related Projects

Explore more of our completed solar installations across Uttar Pradesh.

Ready to Start Your Solar Project?

Get a free consultation and custom quote for your solar needs. Join 500+ satisfied customers.

Useful next steps for homeowners and businesses comparing rooftop solar in Uttar Pradesh.