150kW Commercial Solar Installation
Large-scale 150 kW solar installation for a manufacturing facility in Shahjahanpur's industrial area, significantly reducing operational costs and carbon footprint. The grid-tied system with net metering generates over 2.1 lakh units annually, cutting monthly electricity bills from Rs 3 lakhs to under Rs 90,000 and delivering an expected ROI within 3.5 years.
The Challenge
The manufacturing facility had high energy consumption during peak hours, resulting in expensive electricity bills exceeding ₹3 lakhs monthly. Limited roof space required optimal panel placement.
Our Solution
We designed a custom 150kW system with high-efficiency monocrystalline panels, optimizing panel placement across multiple rooftops. Implemented a grid-tied system with net metering for maximum savings.
Project Highlights
Key achievements and notable features from this installation.
70% reduction in electricity costs
200+ high-efficiency panels installed
Grid-tied system with net metering
Remote monitoring dashboard
ROI expected in 3.5 years
Reduces 180 tons CO2 annually
Technical Specifications
System components and configuration details for this project.
"The solar installation has transformed our business economics. We're now saving over ₹2 lakhs monthly on electricity bills. BL Solar's professional team completed the project on time with zero disruption to our operations."
Related Projects
Explore more of our completed solar installations across Uttar Pradesh.
Ready to Start Your Solar Project?
Get a free consultation and custom quote for your solar needs. Join 500+ satisfied customers.